Friday, 28 August 2009, 6:00am
The second batch of concrete was placed in the backyard yard finishing the pergola area. The front pathway was also placed leading up to the front porch area. We really liked having the pathway curve from the drive way and also creating a small planting area. Within a few days of having the concrete placed, Charlie had the hot tub delivered and by the time I came home from work, the tub was filled and operational.
Take a look at the pictures taken on the 18 June 2009:
Farook Khan
Looks Very Nice!!